510.810.6462  |  contact@arlene-ambrish.comMy Home Value  |  Contact us  |  Market data
Home / Guides / Oakland's 2045 General Plan and SB 79: What Homeowners in Rockridge, Temescal and Montclair Should Know

Oakland's 2045 General Plan and SB 79: What Homeowners in Rockridge, Temescal and Montclair Should Know


Quick answer

Oakland is updating its General Plan in two phases. Phase 1 (housing, safety and zoning changes) was adopted in 2023; Phase 2 covers land use and other elements, with draft elements expected in February 2027, public comment through June 2027, and adoption expected in winter 2027. Separately, the state's SB 79, in effect since July 1, 2026, allows taller, denser housing on qualifying sites near major transit stops such as BART.

Phase 1Housing Element adopted Jan 2023; zoning amendments adopted Oct 2023
Phase 2 draft elementsExpected February 2027
Phase 2 public commentFebruary to June 2027
Phase 2 adoptionExpected winter 2027
SB 79 effectiveJuly 1, 2026 (state law)
SB 79 near heavy railUp to 75 ft within 1/4 mile; 65 ft from 1/4 to 1/2 mile, on qualifying sites

If you own a home in Rockridge, Temescal, Montclair or nearby, you have probably heard that Oakland is “upzoning.” Some of that is decided, some is still a draft, and some comes from state law rather than the City. Here is the plain version, with dates, so you can tell which is which. Owners in Piedmont are covered by Piedmont’s own planning rules, not Oakland’s General Plan.

What is the Oakland 2045 General Plan update?

A general plan is a city’s long-range blueprint for land use, housing, transportation, safety and more. Oakland is updating its plan in two phases.

Phase 1 (2021 to 2023), adopted: – Housing Element adopted January 2023 and certified by the state in February 2023. – Environmental Justice and Safety Elements adopted September 2023. – Planning Code (zoning) amendments adopted October 2023.

Phase 2, in progress. According to the City’s General Plan page as read on November 24, 2026:

Step Timing
Draft Land Use Framework published March 2026
Community review of the framework March 9 to April 30, 2026
Notice of Preparation for the Environmental Impact Report July 3, 2026
Draft Elements published February 2027
Public comment period February to June 2027
Expected adoption of Phase 2 Elements Winter 2027

The City has revised this schedule before, so check the page for the current dates.

What is SB 79, and how is it different?

SB 79 is a state law, signed October 10, 2025 and in effect since July 1, 2026. It makes qualifying “transit-oriented” housing projects an allowed use on sites zoned for residential, mixed-use or commercial development near qualifying transit stops in Alameda and other urban counties.

Near heavy rail such as BART (a “Tier 1” stop), ABAG’s summary lists these maximums for qualifying projects:

Distance from the stop Height Density
Within 200 ft of a station entrance 95 ft 160 units per acre
Within 1/4 mile 75 ft 120 units per acre
1/4 to 1/2 mile 65 ft 100 units per acre

Projects must have at least five units, meet minimum density and unit-size rules, and include affordable units above a certain size. Cities can adopt state-approved alternative plans, and some sites (for example in very high fire hazard zones or on local historic registers) can be delayed until after the next housing element cycle.

What does this mean for homeowners?

  • Today, nothing changes on your lot by itself. These rules describe what could be built if an owner chooses to build and a project qualifies.
  • Near Rockridge and MacArthur BART, SB 79 applies to qualifying sites now, under state standards unless the City adopts an approved alternative.
  • For Oakland’s own land use changes, the drafts are still open for comment into 2027. If you have a view, the public comment period is the time to share it with the City.
  • For value, no one can promise a direction. Rules that allow more homes can make some lots more valuable to builders, while owners of single-family homes often care most about what goes next door.

What should I do now?

  1. Look up your address on the City’s General Plan and zoning maps, and on MTC’s draft SB 79 map of transit zones.
  2. Decide whether you want to comment during the 2027 public review.
  3. If you are thinking about selling or buying in the next few years, ask us for a home value read that takes these changes into account.

General information, not legal or planning advice. Dates and standards as read on City of Oakland, HCD and ABAG pages on November 24, 2026.

Questions people ask

Has Oakland already rezoned my neighborhood under the 2045 General Plan?

Phase 1 zoning amendments were adopted in October 2023. The Phase 2 land use elements are still in draft; the City's page lists draft elements in February 2027 and expected adoption in winter 2027.

Does SB 79 mean apartment buildings can go on any lot near BART?

No. SB 79 applies to qualifying projects on sites zoned for residential, mixed-use or commercial use within a half mile of qualifying stops, with project size, affordability and other requirements, and some sites can be exempted or delayed under local plans approved by the state.

Will these changes raise or lower my home's value?

Nobody can say with certainty. What we can do is show you what comparable homes near and away from transit have sold for, and update that as plans become final.

Sources